You are currently viewing Redwater Condensate Off-loading Rail Terminal

Redwater Condensate Off-loading Rail Terminal

Redwater Condensate Off-loading Rail Terminal

This 16-station rail off-loading facility injects nitrogen vapour to offload condensate from rail cars into storage bullets. The condensate is then blended with crude to upgrade the quality of the product for export to pipeline.

The facility design includes:
•16 station rail unloading
•Two API storage tanks and two bullets
•Butane and condensate blending
•Product mixers complete with controls—RVP control
•Two product pipeline pumps
A key challenge to the project schedule was designing and acquiring the high-pressure pipeline pumps to move the product from the terminal to the market
Rangeland Responsibilities:
•Detail engineering
•Project management
•Procurement, materials management and expediting of all equipment
•Operator training and commissioning support